Fuel
Our Commitment ETD consistently adheres to the highest international trading standards. All energy products we trade, such as EN 590 Diesel and Liquefied Natural Gas (LNG), strictly comply with ISO international standards and relevant regional regulatory requirements.
EN590 (ULSD 10PPM)
| Parameter | Standards |
| Sulfur Content | Max 10 mg/kg |
| Cetane Index | Min 46.0 |
| Flash Point | Min 55 °C |
| @ 15°C Density | 820 – 845 kg/m³ |
| CFPP | Seasonal/Regional Adjustment |
liquefied natural gas
| Parameter | Typical Range |
| Methane/C1 | Min 85% – 95% |
| Net Calorific Value | 48 – 52 MJ/kg |
| Nitrogen Content | Max 1.0% |
| H2S | Max 5 mg/Nm³ |
SOP (Neg. Phase) SCO → LOI → FCO → ICPO → SPA
- SOP (Standard Operating Procedure) – Negotiation Phase
- Seller: SCO (Soft Corporate Offer)
Introduces supply capability, including product name, specifications, origin and loading port, monthly and total availability, MOQ (Minimum Order Quantity), price, and payment terms.
- Buyer: LOI (Letter of Intent)
Indicates purchase intent, including product, specifications, quantity, price, destination port, transaction method, and payment terms.
- Seller: FCO (Full Corporate Offer)
Issues a binding, official offer to the buyer.
- Buyer: ICPO (Irrevocable Corporate Purchase Order)
Issues an irrevocable procurement document to the seller.
- Both Parties: SPA (Sales and Purchase Agreement)
Contract signed based on the FCO and ICPO.
- Execution Phase: Payment, delivery, inspection, etc., will be coordinated within the SPA.
